Whitby Water Supply Plant
Pump Station Relocation
Client: Jeviso Construction Corporation, Vaughan ON​
​
Contract Type / Kehoe Role: Subcontract Agreement / Marine Subcontractor
​
Project Summary:
​
General Description of the work included:
​
-
Interior cleaning of the existing intake pipe (CPP) in Lake Ontario and intake pipe from surge chamber/intake chamber to intake well, as required to perform work.
-
New high density polyethylene (HDPE) DR11 raw water sample lines and chlorination lines including all valves, fittings, connections, fasteners, ballast cable and all related appurtenances.
-
New 75 mm schedule 80 PVC Diffuser and related accessories.
-
Submittals including work plans, health and safety plans, environmental protection plans, shop drawings, Operating, Maintenance Manuals.
-
Mechanical connection and commissioning the system.
​
New Raw Water and Chlorine Lines Work included:
​
-
Removal of existing chlorine solution and raw water sampling lines, diffuser and associated appurtenances in the plant intake (intake crib to respective pumps connections at the Whitby WSP).
-
Remotely operated vehicle (ROV) inspections of the intake, as described herein.
-
Cleaning of intake crib and intake structure down the intake shaft elbow (removal of mussel and silt accumulation along all surface walls, ceiling and floor of shaft structure).
-
Fabrication, installation, testing and commissioning of new chlorine solution and raw water sampling pipe bundles and diffusers in the plant intake at the Whitby WSP.
-
Secure and pay for the cost of additional required permits.