top of page

Oshawa Harbour
Maintenance Dredging

Client: Hamilton Oshawa Port Authority (HOPA)
Contract Type / Kehoe Role: Design Bid Build / General Contractor
Project Summary: The project consisted of Maintenance Dredging and Sediment disposal for the approach channel to Oshawa Harbour.
The works included:
-
Project startup including mobilization to the site.
-
Development, implementation, and maintenance of a site-specific Health and Safety Plan.
-
Provision and maintenance of temporary facilities and controls.
-
Dredging, removal of dredged sediment from dredge areas and open water disposal of sediment at the location specified on the drawings.
-
Dredging operations to accommodate vessel traffic at the port of Oshawa in conjunction with the Harbour Master's Office.
-
Demobilization and closeout.
bottom of page