Holiday Inn Shoreline Protection
%20DRILLING%20PHOTO%20STILLS%20RAW%20(8)%20(1).jpg)
Client: InnVest Hotels
Contract Type / Kehoe Role: Design Bid Build / General Contractor
Project Summary:
The sheet pile shoreline protection system protected the foundation of the Holiday Inn from Lake Ontario wave action.
The pile driving work included:
Installation of 42 linear meters of EZ80 steel sheet piles driven to bedrock with toe pins grouted 1000mm into bedrock, new diagonal tie rod anchors grouted into bedrock; new continuous C310x45 double channel wale and a concrete pile cap.