Holiday Inn Shoreline Protection
 

BEATTIE FILM - 2025 - KEHOE - 17) DRILLING PHOTO STILLS RAW (8) (1).jpg

Client: InnVest Hotels

Contract Type / Kehoe Role:  Design Bid Build / General Contractor

Project Summary:

The sheet pile shoreline protection system protected the foundation of the Holiday Inn from Lake Ontario wave action.

The pile driving work included:

Installation of 42 linear meters of EZ80 steel sheet piles driven to bedrock with toe pins grouted 1000mm into bedrock, new diagonal tie rod anchors grouted into bedrock; new continuous C310x45 double channel wale and a concrete pile cap.

 