100 Foot Park - City of Kingston

Hundred 2.png

Client: City of Kingston

Contract Type / Kehoe Role:  Design Bid Build / General Contractor

Project Summary:

The work involved development and alteration to a shoreline for the purpose of repairing an existing stacked armour stone retaining wall and adding a new splash apron along approximately 110 metres of shoreline, replacing two pedestrian bridges over a storm drainage channel and completing new erosion protection measures (consisting of a riprap toe berm and slope stabilization plantings on the upper bank) along approximately 49 metres of shoreline. Sediment and erosion control measures were utilized during construction.

Site features included:

  • Armour stone and Rock placement

  • Park Benches

  • Limestone pathways

  • Tree Protection and Pruning

  • Tree and Shrub Planting

  • Tree Removal

  • Soil excavation and on-site disposal

  • Topsoil and Seed

  • Concrete footings for railings