Project Summary:
The work involved development and alteration to a shoreline for the purpose of repairing an existing stacked armour stone retaining wall and adding a new splash apron along approximately 110 metres of shoreline, replacing two pedestrian bridges over a storm drainage channel and completing new erosion protection measures (consisting of a riprap toe berm and slope stabilization plantings on the upper bank) along approximately 49 metres of shoreline. Sediment and erosion control measures were utilized during construction.
Site features included:
-
Armour stone and Rock placement
-
Park Benches
-
Limestone pathways
-
Tree Protection and Pruning
-
Tree and Shrub Planting
-
Tree Removal
-
Soil excavation and on-site disposal
-
Topsoil and Seed
-
Concrete footings for railings