
Hucks Marine & Resort
Totem Dock

Client: Hucks Marine & Resort, Rockport Ontario
Project Summary:
Kehoe and the esteemed Hucks Marine & Resort have built a strong relationship on dock projects since 2009.
In 2019 the marina expansion project work included:
-
Remove & dispose of all existing docks, decking, cribs, steel cribs, piles & parts building.
-
New stationary docks constructed from a complete steel frame supported on steel piles, driven/drilled into bedrock.
-
The stationary docks were complete with 5" thick reinforced concrete deck & equipped with 10" aluminum cleats.
-
New steel tube floating docks constructed from spiral welded steel floatation units.
-
Docks were complete with pressure treated wood stringers, moisture shield vantage composite decking with hidden fasteners, perimeter trim board & vertical composite staving.
-
Deck was equipped with 10" aluminum cleats.
-
A new aluminum frame ramp with aluminum handrails to access the floating dock finished with moistureshield vantage composite decking.
-
Supply concrete anchors & all required chain to secure new floating docks for year round installation.