top of page

Hamilton Harbour
Maintenance Dredging 

IMG_1899.JPG

Client: Hamilton Oshawa Port Authority​​

​

Contract Type / Kehoe Role: Design Bid Build / General Contractor

​​

Project Summary: Navigational maintenance dredging for Hamilton Harbour and the Burlington Canal Approach.

​

Work included:

​

  • Mechanical dredging of 18,044 m³ Class B Material via an excavator and barge from the Hamilton Harbour Slips with land- based disposal on site;

  • Mechanical dredging 25,417 m³ of Class B Material from Lake Ontario at the Burlington Canal Approach.

  • This included a section of dredging where diver's used a hydro-syphon to remove sediment over the Trans-Northern Pipeline.

  • Coordination of operations with port traffic resulting in no delays to the operation of the port.

  • Pre, progress, and post-dredge bathymetric surveys with weekly progress reports were provided to the Owner.