Hamilton Harbour
Maintenance Dredging

Client: Hamilton Oshawa Port Authority​​
​
Contract Type / Kehoe Role: Design Bid Build / General Contractor
​​
Project Summary: Navigational maintenance dredging for Hamilton Harbour and the Burlington Canal Approach.
​
Work included:
​
-
Mechanical dredging of 18,044 m³ Class B Material via an excavator and barge from the Hamilton Harbour Slips with land- based disposal on site;
-
Mechanical dredging 25,417 m³ of Class B Material from Lake Ontario at the Burlington Canal Approach.
-
This included a section of dredging where diver's used a hydro-syphon to remove sediment over the Trans-Northern Pipeline.
-
Coordination of operations with port traffic resulting in no delays to the operation of the port.
-
Pre, progress, and post-dredge bathymetric surveys with weekly progress reports were provided to the Owner.