top of page

Outfall Diffuser Upgrades
Duffin Creek Water Pollution Control Plant

Client: The Regional Municipality of York
Contract Type / Kehoe Role: Design Bid Build / General Contractor
Project Summary:
The work included removal and disposal of the 63 existing 450-mm long radius 90-degree elbows, and installation of new stainless-steel elbows and diffusers on 63 diffuser ports.
The diffuser valves were pre-purchased by the region. Kehoe supplied the stainless-steel elbows, stored and transported the elbows and diffuser valves, assembled the diffuser units on site and installed them as per the drawings.
bottom of page