top of page

Floating Docks for the Sandra S. Lawn Harbour & Marina

Resized 6.png

Client: Town of Prescott

Date of Construction: 2024

Project Summary:

 

Kehoe has manufactured and installed docks for the Town of Prescott, the gateway to the Thousand Islands since 2011. The most recent project involved removal of the existing A-Dock and installation of a new A-dock. The new dock included a spiral steel floating tube dock with pressure treated decking and 10" aluminum cleats; concrete anchor blocks for year-round installation; electrical pedestals and service; and new water supply plumbing.

bottom of page